Massachusetts Water Resource Authority

UMass Lowell Image

Bringing clean water to metropolitan Boston

UMass Lowell Image

Metrowest Water Supply Tunnel - 17.6 miles long, 200-500' below ground. The tunnel was started in 1996 and stretches from Marlborough to Newton.

UMass Lowell Image

Tunnel boring machine