01/05/2023
By Nathan Klosowski

The Pawtucket St. bridge on East Campus will be closed to all traffic on Jan. 12 from 8 a.m. to 3 p.m. due to construction work at the hydroelectric plant. The rest of Pawtucket St. will remain open as a temporary two-way street and police details will be present to direct traffic. It it unknown if the bridge will be open for pedestrians.