Environmental and Emergency Management

Asbestos on Campus

The University has listed all the locations where asbestos is known to be found and the types of building materials typically containing asbestos.

The consulting firms of Kaselaan & D'Angelo, Barnes & Jarnis and UMass Lowell's Office of Environmental & Emergency Management (EEM) have surveyed the University buildings and identified asbestos containing materials (ACM) in various locations. This collaborative approach of information has been consolidated into a source document providing generalized information regarding the location of samples collected in each UMass building and if the sample contained asbestos materials that the university community should be made aware. This document (pdf - updated October 2015) can be accessed or by contacting the EEM office at extension 4-2618 (978-934-2618). In conjunction to this source document, additional sampling data and abatement information are continually occurring and recorded at the EEM Office for reference and awareness.

Care must be taken to insure that asbestos containing material is not disturbed and protective coverings are not damaged. University faculty, staff, contractors and students (all persons) are directed not to disturb materials containing asbestos, such as drilling into ceilings, floors, fire rated doors, hanging items from ACM materials, cutting, and or removing protective coverings. All persons shall contact the EEM office to request an asbestos determination prior to impacting any suspect materials such as but not limited to insulation, window caulking and glazing, transite paneling, fire rated doors, flooring, mastic, and ceiling materials, wall joint compound, and HVAC duct sealants that have not been identified by EEM.

The University conducts periodic inspections of the asbestos containing materials and makes repairs as necessary to insure that the material remains intact or is contained in protective coverings or abated by licensed individuals. Contact the EEM Office, extension 42618, regarding asbestos material information or to report damage to asbestos containing materials.

 UMass Lowell

North South East West
Alumini Library Allen House Bourgeois Bigelow
Ball Coburn Fox Gould
Costello Concordia Leitch Richardson
Cumnock Dugan University Crossing Read
Eames Durgin   Upham
Perry Mahoney   Web office G.N.
Falmouth McGauvran    
IPI O'Leary    
Kitson Cafeteria    
Lydon Power Plant    
Olney Weed    
Olsen      
Pasteur      
Pinasaki      
Pinasaki Reactor      
Power Plant NCPP      
Steam Tunnel      
Smith      
Southwick      

 Alumni Library (top)

Location Description Asbestos: (Yes/No)
 
Acoustic Plaster Walls /Ceilings, All floors. Yes
Basement Pipe Insulation No
Bottom of wall No
B4 Ceiling Plaster Yes
Wall Plaster No
B-101 Corridor Wall No
Upper Wall No
B-101A Pyrobar Look-alike No
Ceiling #1 Right side No
Left Side No
Ceiling Tile in Basement Bulk No
Corridor Wall Plaster No
First Floor Putty from Window Yes
Putty from Window #2 Yes
Floor Tile in Basement Foyer Bulk No
Mastic from #3 No
Ceiling Material No
Second Floor Putty and Debris from Window #3 Yes
Wall No
Stairs Black Tar under Fieldstone No
Building Fare to Fieldstone Patio No
Ceiling Material in Foyer No
Granite Steps Grey Caulking Material No
Fieldstone Caulking Material No
Vinyl Floor Tile 9" X 9" brown. Yes
Wall in Basement Bulk No

 Ball Hall (top)

Location Description Asbestos: (Yes/No)
106 Black felt paper No
Grey material No
Outer board No
107 Popcorn ceiling (Abated) August 2005 No
109 Floor tile and mastic, popcorn ceiling (Abated) August 2005 No
118 Pipe Insulation No
Elbow Insulation Yes
PCM Yes
Bulk Floor Sample Yes
118-A Floor tile No
121 200 sq. ft. floor tile and mastic, popcorn ceiling and 10 ft of pipe insulation (Abated) August 2010 No
201 Lab bench top Yes
210 Ceiling, floor tile and glue dobs (brown) abated June 2013 No
213 180 sq. ft. floor tile and mastic, popcorn ceiling and 12 glue dobs (Abated) March 2011 No
220 180 sq. ft. floor tile and mastic, popcorn ceiling (Abated) March 2011 No
214 Spray-on ceiling Yes
Elbow of pipe in heat ventilation units Yes
Elbow of pipe Yes
Pipe insulation No
317 Expansion joint debris No
401 Ceiling No
416 Mastic No
C-3 Floor tile Yes
Catwalk to Tile Yes
Olney Mastic Yes
Window Caulk Exterior first floor across from Cumnock No
Interior first floor across from Cumnock in Mech Rm (behind glass) Yes
Ceiling in lab (Dana) Ceiling No
Ceilings Acoustical Ceilings, All floors. Yes
Elbow Insulation   Yes
Exterior Expansion caulking Yes
First floor VFT, Blue No
VFT, white speckled No
Mastic No
TSI on waterline from 101 No
TSI on waterline from ceiling No
TSI on waterline from 102 No
Cove base Yes
Cove base mastic Yes
Bulk No
Glazing window Parking lot side Yes
Parking lot side Yes
Riverside side Yes
NCPP Coal Room 2 Bulk No
Pipe insulation Various types & diameters, All floors. Yes
Vinyl Flooring 9" X 9" floor tiles. Yes
WJUL Floor tile Yes
Ceiling Material No
Mastic No

 Costello (top)

Location Description Asbestos: (Yes/No)
305 Bulk No
Below football room Elbow insulation Yes
Elbow insulation Yes
First floor Drain pipe insulation No
Floor tile   Yes
General Ceiling material shower room #1 No
Pipe elbow above ceiling No
Ceiling material restroom #2 No
Gym Cork beneath wooden floor No
Mastic with cork Yes
Black felt paper Yes
Machine room Pipe fitting insulation Yes
Pipe insulation Emergency generator exhaust. Yes
Pipe joints, All floors. Yes
Tank insulation Mechanical room basement. Yes
Underlay Floor Material Material Yes
Weight room ceiling Ceiling material No
Women’s shower room Ceiling No

 Cumnock (top)

Location Description Asbestos: (Yes/No)
Affirmative action room Walk, bulk No
Storage area, floor tile Yes
Annie’s floor Tan tile Yes
Black mastic No
Brown floor tile   Yes
C-3 Floor tile Yes
Mastic No
Pipe insulation Yes
C-7 PLM wipe No
Floor tile Yes
C-11 Mastic to floor tile No
Ceiling, bulk No
Ceilings Acoustical and plaster on all floors Yes
Dr. Levine’s office, first floor Wipe No
Employee lounge Ceiling material Yes
Wall material No
Floor tile Yes
First floor Tile No
First floor lobby Wall Yes
Ceiling Yes
Lower stairwell Riser No
Skirt No
Mechanical room Basement ceiling insulation No
Mechanical room under C-1 Elbow Yes
Off-white vertical run Yes
Off-white horizontal run Yes
PCM Cumnock hall tunnel Yes
Yes
Pipe insulation Various diameters, All floors. Yes
Projection screen   No
Second floor stairwell Skirt No
Tread No
Lt. mastic, landing tile No
Landing tile No
Mastic from first No
Third floor Brown tile on left No
Vinyl Flooring Brown vinyl sheet flooring, basement. Yes

 Eames (top)

Location Description Asbestos: (Yes/No)
Basement Pipe insulation Yes
Ceiling Basement plaster ceiling. Yes
Hot water distribution room Pipe insulation Yes
Pipe fitting insulation No
Mechanical room Green wall lower section No
Wall plaster No
Soil sample Yes
New boiler room Textured ceiling plaster No
Interior wall-plaster skim and base No
Block pipe insulation Yes
Aircell pipe insulation Yes
12x12 tan floor tile No
Black mastic associated with 05A,05B,05C No
2’x4’ white ceiling tiles No
Pyro block fire stop No
Layered paper pipe insulation Yes
Pipe fitting insulation Yes
Room 103 Wall plaster No
Room 104 Wall plaster No
Room 106 Wall plaster No
Room 209 Wall plaster No
Vinyl Flooring Tan "sheet" vinyl flooring. Yes

 Perry (top)

Location Description Asbestos: (Yes/No)
114 PCM Yes
Ceiling No
Tile Yes
Mastic Yes
Swept from floor/doorway (bulk) No
118 Bulk No
211 Window glazing No
225 Window glazing No
307 Window glazing Yes
414 Window glazing No
Ceilings Corridor (only) acoustical ceilings. Yes
Exterior Window glazing east side No
Window glazing west side Yes
Window perimeter expansion glazing east side Yes
Window perimeter expansion glazing west side Yes
Pipe insulation Various types & diameters, All floors. Yes
Tank insulation Mechanical room. Yes
Vinyl Flooring 9" X 9" brown & 12" X 12" gray. Yes

 FallMouth (top)

Location Description Asbestos: (Yes/No)
201 Elbow insulation Yes
Pipe joint insulation Yes
206 Mastic Yes
Air sample No
Pipe insulation Various types & diameters, All floors. Yes
Stairwell, bookstore Floor tile No
Mastic Yes
Tank insulation Sub Basement. Yes

 IPI (top)

Location Description Asbestos: (Yes/No)
9x9 floor tile Red Tile Yes
Above custodial room Elbow insulation No
Back foyer area Mastic No
Floor tile No
Conference room Mastic Yes
A Floor tile Yes
12x12 floor tile Red Tile Yes
Floor tile Red floor tile Yes
Main storage room Mastic Yes
Mastic from the back of room Yes
Floor tile Yes
Floor tile from the back of room Yes
Machine shop Mastic Yes
Floor tile Yes
Linoleum floor sample   No

 Kitson (top)

Location Description Asbestos: (Yes/No)
Duplicating room Bulk sample – wipe No
Drain pipe Joint insulation No
Pipe insulation Basement floor. Yes
Tank insulation Basement condensate tank. Yes
Tunnel to Tan tile No
Cumnock Mastic off 1 No

 Lydon (top)

Location Description Asbestos: (Yes/No)
Basement Chiller Mechanical Room Yes
Muffler Mechanical Yes
Janitor’s closet – fourth floor Elbow insulation No
Valve insulation No
Mechanical room Elbow Yes
Lydon Innovation Center Basement 6” Wall base molding No
4’x8’ Acoustical Board No
Residual brown and gold carpet adhesive No
Skim coat on concrete wall/column No
Gypsum wallboard No
Joint compound associated with gypsum wallboard and plaster wall No
Plaster wall skim and base No
Plaster ceiling skim and base No
Black coating over window w/squares No
Cement floor white crack sealant Yes
Canvas tape duct seam sealant – Boiler room AC-3 No
Duct hanger seam sealant No
Interior window with metal squares glazing No
Interior window glazing corridor Yes
Exterior door caulk No
Exterior metal window frame caulk East entrance Yes
Exterior wall to ceiling caulk symposium center wall Yes
12x12 slate floor tile grout No
12x12 slate floor tile bedding mortar corridor No
Interior window caulk Yes
Skim coat on concrete ceiling No
Light weight concrete at duct penetration through wall No
Mechanical room Canvas duct vibration cloth RF3 and AC3 Yes
  Abandoned reserve tank flange gasket South East corner Yes
  Air hander rib seam sealant AC3 Yes
  Small holding tank head cover insulation South East corner Yes
  Large holding tank head cover insulation North East side No
Pipe insulation Various types & diameters, basement. Yes
2nd Floor Men’s Bathroom Ceiling plaster No
Sides Left side Yes
Right side Yes
Right side of Chiller Yes

 Olney (top)

Location Description Asbestos: (Yes/No)
Between concrete walls Caulking No
Stairwells All Floors Floor Tile and mastic (Abated) August 2004 No
Basement Mixing station lower elbow Yes
Fire Rated Doors Georgia Pacific Corp. Curtis Door Division (wooden door cores) Yes
Mech Rm Mixing station upper, right elbow No
Mixing station upper, left elbow No
Hot/Cold mixing station Yes
LHS chiller No
RHS chiller No
All Hallways Floor tile and mastic (Abated) No
Rooms 203, 212, 218, 219, 222, 223, 305, 311, 312, 403-B, 410, 414, 507, 508, 510, 513, 515 Floor tile and mastic (Abated) No
Note Old 12x12 tile and black mastic may remain under counter and bench tops Yes
Olney 150 Floor tile and mastic (Abated) June 2006 No
Boiler room Header pipe Glue Dots No
Pipe fitting insulation No
All Labs Glue dots behind chalk boards Yes
Olney 313 Chalkboard removal Glue Dots (Abated) February 2006 No
Emergency Generator Exhaust pipe Yes
Mechanical room Exhaust Generator Pipe Insulator Yes
Heat exchange gasket Yes
Red duct seam sealant Yes
Penthouse Valve CHS 65 No
Bulk No
Pipe insulation Basement mechanical room. Yes
Pipe joints all floors. Yes
Roof Chiller baffle material Yes
Chiller gasket material Yes
Pipe elbow insulation No
Ground Floor, Rm. #23 Elbow insulation No
Room 416 Blackboard mastic No
Room 428 Brown mastic No
Bulk No
Cove base No
Room 430 Blackboard mastic No
Room 519 Bulk No
Room 520 Paneling glue No
Chalkboard mastic Yes
  Brown glue on chalkboard Yes
Mastic Yes
White VFT Yes
Tank insulation Basement mechanical room Yes
Vinyl Floor Tile 12" X 12" White tile, All floors. Yes

 Olsen (top)

Location Description Asbestos: (Yes/No)
Tank insulation Mechanical room. Yes
Basement Elbow insulation from hot water line No
Ceiling tile Bulk asbestos Glue dots No
All Rooms Glue dots behind white boards Yes
Floor tile Bulk asbestos Yes
first floor computer room Floor tile Yes
fifth floor Wall No
Pipe insulation sprayed acoustic No
Machine room Pipe fitting insulation No
Room 222 Floor tile and mastic Yes
Room 102, 103, 107, 108, 112, 511, 612 Floor tile and mastic (Abated) No
Room 310 Insulation No
Room 602 Pipe insulation Yes
Room 606 Floor tile Yes
Ceiling tile Yes
Penthouse Elbow insulation on chill supply pipes No
Roof Chiller baffle material Yes
Chiller gasket material Yes
Pipe insulation Emergency generator exhaust. Yes

 Pasteur (top)

Location Description Asbestos: (Yes/No)
Pipe insulation Various types & diameters, All floors. Yes
BB Bulk No
Hallway Pipe insulation Yes
Mastic   Yes
Room 211 Wall No
third floor corridor Brown, top floor tile No
Red, bottom flooring No
Mastic Yes

 Pinasaki (top)

Location Description Asbestos: (Yes/No)
AC-2 Valve #1, Bulk Yes
Valve #2, Bulk No
Elbow #1 No
Elbow #2 No
Elbow #3 No
Elbow #4 No
Basement 12x12 floor tile Yes
Water tank pipe bulk Yes
Pipe insulation Yes
Pump elbow No
Pipe elbow No
Chiller #2, Elbow #1 No
Chiller #2, Elbow #2 No
Chiller #1, Elbow #1 No
Chiller #1, Elbow #2 No
Elbow on backflow preventer No
Face piece on valve No
Shingle material Yes
Blackboard mastic Yes
Mechanical room Pipe insulation Yes
Pipe insulation Emergency generator exhaust. Pipe joints, All floors. Yes
Roof ventilation Pipe lagging Yes
Elbow lagging No
Room 205 Floor tile and mastic (Abated) No
Elbow pipe insulation in ceiling Yes
Room 207 Floor tile and mastic (Abated) No
Room 209 Floor tile and mastic (Abated) No
Room 211 Floor tile and mastic (Abated) No
Room 213 Floor tile and mastic (Abated) No
Room 213 Elbow pipe insulation in ceiling Yes
Room 303 Bulk samples No
third floor mechanical room Pipe elbow insulation No
Tank insulation Mechanical room 2. Yes
Room 101 Elbow Insulation under sink (exterior wall) abated June 2013 No

 Pinasaki Reactor (top)

Location Description Asbestos: (Yes/No)
Fire proofing Exterior walls of reactor cylinder. Yes
Cooling pipe Insulation No

 Power Plant (NCPP) (top)

Location Description Asbestos: (Yes/No)
Carpenter shop Elbow from heater Yes
Ceiling Ceiling No
Floor Tile First Floor 12 x 12 floor tile and mastic No
First Floor Bathroom 9x9 Floor tile (mastic is clean) Yes
Pipe insulation Inside Boiler #3 (all other insulation abated July 2012) Yes
Tank insulation Receiver Tank Abated July 2012 No
Boiler #3 Header Gasket Yes
Underground steam line and soil White pipe insulation steam line Yes
Loose debris from pile Yes
Outer insulation from pipe Yes

 Steam Tunnel (Southwick - Eames) (top)

Location Description Asbestos: (Yes/No)
Pipe insulation All pipes. Yes

 Smith (top)

Location Description Asbestos: (Yes/No)
Basement Office pipe insulation Yes
Closet pipe insulation Yes
Cafeteria Dishwasher wall plaster No
Ceiling pipe insulation Yes
Ceiling No
Mechanical room Pipe insulation Yes
Pipe fitting insulation Yes
Textured ceiling plaster Yes
Hot water tank insulation Yes
Aircell pipe insulation Yes
Block pipe insulation Yes
Pipe insulation Located in basement. Yes
Room 104 Wall plaster No
Room 106 Wall plaster No
Vinyl Flooring Tan "Sheet" vinyl flooring, All floors. Yes

 Southwick (top)

Location Description Asbestos: (Yes/No)
Pipe insulation Various types & diameters, All floors. Yes
Email area 9x9 floor tile No
Fax/ ATM area 9x9 gray floor tile No
Game room 9x9 gray floor tile Yes
Kitchen Black pipe insulation Yes
Wall air duct bulk Yes
Room 303 Brown tile Yes
Black tile Yes
Yellow mastic from black tile No
Room 305 Black mastic from brown tile No
Yellow mastic from brown tile No
Room 307 Tan tile Yes
Black mastic from tan tile Yes
Yellow mastic from tan tile No
Student mail room 9x9 floor tile No
Tunnel to Smith Joint filler No
TV area 9x9 floor tile No

UMass Lowell South

 Allen House (top)

Location Description Asbestos: Yes/No
Basement Boiler room’s aircell pipe insulation Yes
Brown paper pipe insulation Yes
Living room Ceiling plaster No
Kitchen Ceiling plaster No
first floor 9x9 green vinyl tile Yes
2nd floor Vinyl tile No
9x9 gray tile Yes
Black vinyl tile No
Pipe insulation Various types & diameters, All floors Yes
Vinyl Floor Tile 9" X 9" green tile. Yes

 Coburn (top)

Location Description Asbestos: Yes/No
Pipe insulation Various types & diameters, All floors. Yes
Brick moldings Caulking No
Boiler room Ceiling No
Breaching insulation No
Ground floor Window trim No
Exit door paint No
Exit door trim No
Outside door Yes
Outside paneling No
first floor Fire escape door No
Door of fire escape No
Door trim of fire escape No
2nd floor Fire escape door No
Paint of fire escape door #1 No
Trim of fire escape door #1 No
Black trim of fire escape door #2 No
Room 112 Ceiling Plaster No
Room 205 Wall Ceiling No
Room 209 Hallway bulk No
Room 306 Hallway bulk No
Window Black paint on window sill No
Black window pane No
Window pane glazing No
Wood putty No

 Concordia (top)

Location Description Asbestos: Yes/No
Vinyl Floor Tile 9" X 9" tile. Yes
first floor Men’s room ceiling No
Pipe insulation Various sizes in Penthouse. 6th floor elevator lobby. Yes

 Dugan (top)

Location Description Asbestos: Yes/No
Vinyl Floor Tile 9" X 9" tan, gray & blue tile, All floors. Yes
Chalkboard Adhesive No
Computer lab Tile No
first floor Closet, PCM No
Janitor’s closet Yes
Ceiling material No
2nd floor Pipe insulation Yes
Closet, PCM No
Janitor’s closet, bulk Yes
Room #1 tile Yes
Room #2 tile Yes
Room #3 tile Yes
Mastic No
Hallway ceiling material No
Storage room Left pipe sample Yes
Right pipe sample Yes
first Floor Registrar’s Office March 2013 2’x2’ Ceiling tile main entrance No
Gray duct seam sealant No
Sprinkler pipe thread sealant No
White Block Pipe insulation corridor and Room 101 Yes
Gypsum wall panel Room 101G No
Basecoat wall plaster No
Skim coat wall plaster No
Yellow and black carpet adhesive Room 101, 101A, 101H, and next to stairwell Yes
Black cove base and cove base adhesive No
Joint compound Room 101, 101E, and 101F No
Gypsum wallboard Room 101, 101E No
Drain Line Insulation next to Room 101D Yes
Floor leveler Room 101 No
Sink basin undercoating No
Ceramic tile grout/mortar Room 101D No
2’x4’ ceiling tile Room 101 No
Red fire stop Room 101 No
Glue behind gypsum wall panel No
Gray Window caulking Yes
Pipe Insulation Various types & diameter, All floors. Yes

 Durgin (top)

Location Description Asbestos: Yes/No
114 Purple textured floor tile Yes
Red textured floor tile No
Floor tile mastic Yes
Blue textured floor tile No
White floor tile No
Cove base No
Cove base mastic No
Generator Exhaust pipe No
Janitor’s closet Hot water pipe insulation No
Room 419 Abated 120 sq. ft. of purple floor tile and black mastic (6/17/2012) No
Mechanical Room Generator Pipe Insulation No
Custodial Room 310 Elbow Insulation No
Roof Membrane Black Heterogeneous, Fibrous, Roofing Felt Yes

 Mahoney (top)

Location Description Asbestos: Yes/No
Ceilings Acoustical ceilings, All floors unless otherwise noted. Yes
Ductwork dust Sampled November 2001 No
Window Window caulking Yes
Floor tile and mastic all floors unless otherwise noted Yes
first Floor Hallway Floor tile and mastic (Abated) July 2006 No
Rooms 200/201 Floor tile and mastic and acoustical ceiling (Abated) July 2006 No
Room 212 A,B,C Floor tile and mastic and acoustical ceiling (Abated) June 2007 No
Gym Double door insulation No
Partition core No
Men’s locker room Shower ceiling No
Steam Pit Pipe insulation Yes
Auditorium Wall No
Rooms B7,B8,101, 103, 108 Over laid 12x12 non acm tile over 9x9 tile and mastic containing asbestos Yes
 
Office B4 80 sq. ft. floor tile and mastic (Abated) No
Gym Double Door Insulation No
Brown patrician core No
Women’s locker room Room No
Offices #1 PCM (Air Sample) 3/28/2005 No
#2 PCM (Air Sample) 3/28/2005 No
#3 PCM (Air Sample) 3/28/2005 No
#4 PCM (Air Sample) 3/28/2005 No
#5 PCM (Air Sample) 3/28/2005 No
#6 PCM (Air Sample) 3/28/2005 No
#7 PCM (Air Sample) 3/28/2005 No
#8 PCM (Air Sample) 3/28/2005 No
#9 PCM (Air Sample) 3/28/2005 No
Pipe insulation Various types & diameters. All floors. Yes
North Stairwell Ground Floor Floor tile and mastic ground floor landing (Abated) March 2009 No
Square wall panels Acoustical tile material and brown glue dobs on wall Yes
Room 9 PCM No
Air sample No
Room 110-A Room No
Room 202 PCM (Air Sample) 6/15/2005 No
Room 203 PCM (Air Sample) 6/21/2005 No
Room 209 Room No
Room 211 PCM (Air Sample) 4/20/2005 No
Room 214 PCM (Air Sample) 8/10/2000 No
Swipe No
Tank insulation Mechanical room. Yes
Weight room Ceiling No

 McGauvran (top)

Location Description Asbestos: Yes/No
2nd floor 16x16 Tan/Red floor tile over 12x12 dark brown floor tiles and mastic (Tile Over) Yes
Tile from the TV area Yes
Mastic from around the Exit door Yes
Mastic from around the TV area Yes
first floor 12x12 dark brown floor tile/mastic All Floors Yes
second Floor Cat Walk Area Tile and mastic at elevator lobby, and entire Catwalk Area (Abated 8/20/2010) No
third Floor Cat Walk Area Tile and mastic at elevator lobby, and entire Catwalk Area (Abated 8/20/2010) No

 O'Leary (top)

Location Description Asbestos: Yes/No
Room 500 Roof drain No
All Floors 12x12 Dark brown floor tile and mastic unless otherwise noted Yes
Interior Emergency Generator Tank insulation, exhaust insulation (Abated June 2013) No
Basement Hallway and Electric Room Floor tile and mastic 780 sq. ft. (Abated) June 2012 No
Mailroom Floor tile and mastic 700 sq. ft. (Abated) November 2011 No
First Floor and Mezzanine Floor tile and mastic 14,000 sq. ft. (Abated) June 2011 No
1000 Linear feet of acm adhesive paper (Abated) June 2011 No
500 sq. ft. duct seam sealant and 60 linear feet of gray caulking at brick and concrete junctions (Abated) June 2011 No
first and fourth Floors Sept and Nov 2010 testing results Red/gray duct seam sealant various Locations above ceilings Yes
Adhesive associated with foil paper above ceiling, between angle iron cleat and ceiling deck throughout floor Yes
Window frame caulk and glazing Yes
Gray caulk at brick concrete junctions Yes
Black cementitious wall panels, rooms 412, 413, and 414 Yes
Compressed wood fiber/paper (tectum-style) ceiling panels No
Wall base molding and adhesive No
2’x4’ ceiling tile front entrance No
Mudded pipe fitting insulation on heating lines first and fourth floors No
Pipe thread sealant on heating lines first and fourth floors No
Pre-fabricated gypsum wall panels first and fourth floors No
Carpet adhesive on quarry tile, front entry, Room 110, 114, and open library area, Room 437 No
Bedding mortar and grout associated with quarry tile No
Ceramic wall and floor tile grout, all areas both floors No
Plaster ceiling finish and base coat, restrooms both floors No
Floor leveling compound, Room 114 No
2’x’2 ceiling tile fourth floor offices No
Room 222 Dark blue carpet with golden brown adhesive No
fourth Floor Floor tile and mastic 7,000 sq. ft. and duct seam sealant 400 linear feet (Abated) June 2011 No
Floor tile and mastic 15,000 sqft, ACM cement board, window glazing and ductwork seam sealant associated with English Department project renovation. (Abated) December 2010 through January 2011 No

 South Campus Cafeteria (top)

Location Description Asbestos: Yes/No
Tank insulation Basement mechanical room. Yes
Catering dry store and Cafeteria Floor tile Yes
Personnel room Yes
Mastic Yes
Mastic from personnel room Yes
Tan 12x12 floor tile and mastic Yes
Elbows #1 No
#2 No
#3 No
#4 No
#5 No
Pipe elbow #1 No
Pipe elbow #2 No
Mechanical room Hot water pipe insulation No
Chill pipe elbow insulation No
Elbow Insulation No

 South Campus Power Plant (top)

Location Description Asbestos: Yes/No
Pipe insulation Various types & diameters, All floors. Yes
Boiler #2 Bulk No
Drum material No
Hazard waste room Elbow #1 No
Elbow #2 No
first floor Condensate tank face bulk No
Condensate tank side bulk No
Tank insulation Boiler room. Yes
Valves #1 Yes
#2 Yes
#3 Yes

 Weed (top)

Location Description Asbestos: Yes/No
Between window and brick and concrete and brick Caulking No
first floor Mechanical room pipe insulation No
Joint elbow No
Insulation from valve joint Floor tile No
Floor tile Red Yes
Mastic Black Yes
Classrooms 201, 204, and 206 Floor tile and mastic (Abated 12/27/2007) No
Janice Stecchi’s office, first floor Wipe No
Lecture Room #3 Pipe elbow from sink No
Mechanical Room #001 Valve insulation pipe to condensate tank from the hot water condensate tank No
Elbow insulation, joint to condensate pipe from the elbow pipe No
Valve insulation from hot water No
Elbow #1 No
Elbow #2 No
Elbow #3 No
Mechanical Rooms Hard pack elbow and fittings at various Locations near strainer; AC2, AC3, AC4, AC5, AC6, AC7, AC8, AC10 No
Mechanical Room Hard pack mudded fitting on fiberglass pipe run (12” Line) Chill Water Supply North Side Yes
Mechanical Room Hard pack mudded fitting on fiberglass pipe run (1” Line) Condensate North side No
Mechanical Room Cement coating over fiberglass insulated fitting chill water supply and return North and South Side. Also on Chill Water UT Tank No
Room 303 Bulk from bench top No
Bulk from bench top, Saff hallway No
Room 305 Wall mount glassware holder Yes
Room 307 Bulk from pipe elbow on table No
Window Caulking Yes
Vinyl Floor Tile 12" X 12" tan tile, All floors. Yes

UMass Lowell East

 Bourgeois (top)

Location Description Asbestos: Yes/No
Boiler room basement Ceiling No
Ceilings Sprayed acoustical ceilings, All floors. Yes
Duct insulation Boiler room exhaust pipe. Yes
first floor Lobby air sample No
East wing air sample No
West wing air sample No
2nd floor Lobby air sample No
East wing air sample No
West wing air sample No
third floor Lobby air sample No
East wing air sample No
West wing air sample No
fourth floor Lobby air sample No
East wing air sample No
West wing air sample No
Mechanical room, basement Elbow 1 No
Elbow 2 No
Debris No
Bulk, top No
Bulk, middle No
Bulk, bottom No
Valve insulation Yes
Boiler Refractory Material No
Rope Gasket Boiler Doors Yes
Boiler Rib Rope Gasket No
Pipe Gasket No
Gypsum wallboard and joint comp. No
Note Boiler removed and abated July 2011  
Pipe insulation Generator room exhaust pipe. Yes
Room 109 Textured ceiling abated 180 sq. ft. July 13, 2012 No
Vinyl Floor Tile White 9" X 9" in building, All floors. Yes

 Fox (top)

Location Description Asbestos: Yes/No
Basement Pump #3 No
Elbow from pipe No
Hot water pipe elbow No
Pipe #2 elbow No
Pipe insulation The emergency generator exhaust pipe. Yes
Telecommunication room Elbow No
Vinyl Floor Tile 12" X 12" gray vinyl floors 1 through 6 Yes

 Leitch (top)

Location Description Asbestos: Yes/No
Ceilings Sprayed acoustical ceilings, All floors. Yes
first floor Lobby air sample No
East wing air sample No
West wing air sample No
2nd floor Lobby air sample No
East wing air sample No
West wing air sample No
third floor Lobby air sample No
East wing air sample No
West wing air sample No
fourth floor Lobby air sample No
East wing air sample No
West wing air sample No
Room 115 Textured ceiling 260 sqft abated July 11, 2011 No
Pipe insulation Hot water tank room. Yes
102 PCM No
Air sample No
312 Ceiling material Yes
Air sample No
316 Air sample by PLM No
Room 209 Textured ceiling 150 sqft abated July 13, 2011 No

 University Crossing (top)

Location Description Asbestos: Yes/No
Common Wall between Sisters and Gagnon Bldg. Transite Panel Yes
Sisters Bldg. third floor nurses area and basement electrical room Spray on Fireproofing No
Sisters Bldg. third Floor Stairwell Perimeter Waterproofing No
Gagnon Building Roof Brown Insulation No
Built up tar and gravel No
Insulation under tar and gravel No
Tar on concrete deck No
Felt/tar between insulation No

UMass Lowell West

 Bigelow (top)

Location Description Asbestos: Yes/No
Ceilings All textured ceiling paint.  
Kitchen Elbow insulation No

 Gould (top)

Location Description Asbestos: Yes/No
Pipe insulation Various types & diameters, All floors.  
Porch Porch paint (Lead 37.3) Yes

 Richardson (top)

Location Description Asbestos: Yes/No
Fire Proofing Structural beams.  
Pipe insulation Various types & diameters, All floors.  
Tank insulation Basement.  
Boiler breeching Basement.  

 Read (top)

Location Description Asbestos: Yes/No
Tank insulation Basement.  

 Upham (top)

Location Description Asbestos: Yes/No
Walls Textured paint 2nd floor new addition.  
Pipe insulation Various types & diameters, All floors.  

 Web Office G.N (top)

Location Description Asbestos: Yes/No
Kitchen Wipe No
PCM Yes
Attic Wipe No
PCM No
Basement Wipe No
PCM No