The University has listed all the locations where asbestos is known to be found and the types of building materials typically containing asbestos.
The consulting firms of Kaselaan & D'Angelo, Barnes & Jarnis and UMass Lowell's Office of Environmental & Emergency Management (EEM) have surveyed the University buildings and identified asbestos containing materials (ACM) in various locations. This collaborative approach of information has been consolidated into a source document providing generalized information regarding the location of samples collected in each UMass building and if the sample contained asbestos materials that the university community should be made aware. This document (pdf - updated October 2015) can be accessed or by contacting the EEM office at extension 4-2618 (978-934-2618). In conjunction to this source document, additional sampling data and abatement information are continually occurring and recorded at the EEM Office for reference and awareness.
Care must be taken to insure that asbestos containing material is not disturbed and protective coverings are not damaged. University faculty, staff, contractors and students (all persons) are directed not to disturb materials containing asbestos, such as drilling into ceilings, floors, fire rated doors, hanging items from ACM materials, cutting, and or removing protective coverings. All persons shall contact the EEM office to request an asbestos determination prior to impacting any suspect materials such as but not limited to insulation, window caulking and glazing, transite paneling, fire rated doors, flooring, mastic, and ceiling materials, wall joint compound, and HVAC duct sealants that have not been identified by EEM.
The University conducts periodic inspections of the asbestos containing materials and makes repairs as necessary to insure that the material remains intact or is contained in protective coverings or abated by licensed individuals. Contact the EEM Office, extension 42618, regarding asbestos material information or to report damage to asbestos containing materials.
North Campus
South Campus
East Campus
West Campus
Location | Description | Asbestos: (Yes/No) |
---|
Acoustic Plaster | Walls /Ceilings, All floors. | Yes |
---|
Basement | Pipe Insulation | No |
---|
| Bottom of wall | No |
---|
B4 | Ceiling Plaster | Yes |
---|
| Wall Plaster | No |
---|
B-101 | Corridor Wall | No |
---|
| Upper Wall | No |
---|
B-101A | Pyrobar Look-alike | No |
---|
Ceiling #1 | Right side | No |
---|
| Left Side | No |
---|
Ceiling Tile in Basement | Bulk | No |
---|
Corridor | Wall Plaster | No |
---|
First Floor | Putty from Window | Yes |
---|
| Putty from Window #2 | Yes |
---|
Floor Tile in Basement Foyer | Bulk | No |
---|
| Mastic from #3 | No |
---|
| Ceiling Material | No |
---|
Second Floor | Putty and Debris from Window #3 | Yes |
---|
| Wall | No |
---|
Stairs | Black Tar under Fieldstone | No |
---|
| Building Fare to Fieldstone Patio | No |
---|
| Ceiling Material in Foyer | No |
---|
| Granite Steps Grey Caulking Material | No |
---|
| Fieldstone Caulking Material | No |
---|
Vinyl Floor Tile | 9" X 9" brown. | Yes |
---|
Wall in Basement | Bulk | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
106 | Black felt paper | No |
---|
| Grey material | No |
---|
| Outer board | No |
---|
107 | Popcorn ceiling (Abated) August 2005 | No |
---|
109 | Floor tile and mastic, popcorn ceiling (Abated) August 2005 | No |
---|
118 | Pipe Insulation | No |
---|
| Elbow Insulation | Yes |
---|
| PCM | Yes |
---|
| Bulk Floor Sample | Yes |
---|
118-A | Floor tile | No |
---|
121 | 200 sq. ft. floor tile and mastic, popcorn ceiling and 10 ft of pipe insulation (Abated) August 2010 | No |
---|
201 | Lab bench top | Yes |
---|
210 | Ceiling, floor tile and glue dobs (brown) abated June 2013 | No |
---|
213 | 180 sq. ft. floor tile and mastic, popcorn ceiling and 12 glue dobs (Abated) March 2011 | No |
---|
220 | 180 sq. ft. floor tile and mastic, popcorn ceiling (Abated) March 2011 | No |
---|
214 | Spray-on ceiling | Yes |
---|
| Elbow of pipe in heat ventilation units | Yes |
---|
| Elbow of pipe | Yes |
---|
| Pipe insulation | No |
---|
317 | Expansion joint debris | No |
---|
401 | Ceiling | No |
---|
416 | Mastic | No |
---|
C-3 | Floor tile | Yes |
---|
Catwalk to | Tile | Yes |
---|
Olney | Mastic | Yes |
---|
Window Caulk | Exterior first floor across from Cumnock | No |
---|
| Interior first floor across from Cumnock in Mech Rm (behind glass) | Yes |
---|
Ceiling in lab (Dana) | Ceiling | No |
---|
Ceilings | Acoustical Ceilings, All floors. | Yes |
---|
Elbow Insulation | | Yes |
---|
Exterior | Expansion caulking | Yes |
---|
First floor | VFT, Blue | No |
---|
| VFT, white speckled | No |
---|
| Mastic | No |
---|
| TSI on waterline from 101 | No |
---|
| TSI on waterline from ceiling | No |
---|
| TSI on waterline from 102 | No |
---|
| Cove base | Yes |
---|
| Cove base mastic | Yes |
---|
| Bulk | No |
---|
Glazing window | Parking lot side | Yes |
---|
| Parking lot side | Yes |
---|
| Riverside side | Yes |
---|
NCPP Coal Room 2 | Bulk | No |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
Vinyl Flooring | 9" X 9" floor tiles. | Yes |
---|
WJUL | Floor tile | Yes |
---|
| Ceiling Material | No |
---|
| Mastic | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
305 | Bulk | No |
---|
Below football room | Elbow insulation | Yes |
---|
| Elbow insulation | Yes |
---|
First floor | Drain pipe insulation | No |
---|
Floor tile | | Yes |
---|
General | Ceiling material shower room #1 | No |
---|
| Pipe elbow above ceiling | No |
---|
| Ceiling material restroom #2 | No |
---|
Gym | Cork beneath wooden floor | No |
---|
| Mastic with cork | Yes |
---|
| Black felt paper | Yes |
---|
Machine room | Pipe fitting insulation | Yes |
---|
Pipe insulation | Emergency generator exhaust. | Yes |
---|
| Pipe joints, All floors. | Yes |
---|
Tank insulation | Mechanical room basement. | Yes |
---|
Underlay Floor Material | Material | Yes |
---|
Weight room ceiling | Ceiling material | No |
---|
Women’s shower room | Ceiling | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Affirmative action room | Walk, bulk | No |
---|
| Storage area, floor tile | Yes |
---|
Annie’s floor | Tan tile | Yes |
---|
| Black mastic | No |
---|
Brown floor tile | | Yes |
---|
C-3 | Floor tile | Yes |
---|
| Mastic | No |
---|
| Pipe insulation | Yes |
---|
C-7 | PLM wipe | No |
---|
| Floor tile | Yes |
---|
C-11 | Mastic to floor tile | No |
---|
| Ceiling, bulk | No |
---|
Ceilings | Acoustical and plaster on all floors | Yes |
---|
Dr. Levine’s office, first floor | Wipe | No |
---|
Employee lounge | Ceiling material | Yes |
---|
| Wall material | No |
---|
| Floor tile | Yes |
---|
First floor | Tile | No |
---|
First floor lobby | Wall | Yes |
---|
| Ceiling | Yes |
---|
Lower stairwell | Riser | No |
---|
| Skirt | No |
---|
Mechanical room | Basement ceiling insulation | No |
---|
Mechanical room under C-1 | Elbow | Yes |
---|
| Off-white vertical run | Yes |
---|
| Off-white horizontal run | Yes |
---|
PCM | Cumnock hall tunnel | Yes |
---|
Pipe insulation | Various diameters, All floors. | Yes |
---|
Projection screen | | No |
---|
Second floor stairwell | Skirt | No |
---|
| Tread | No |
---|
| Lt. mastic, landing tile | No |
---|
| Landing tile | No |
---|
| Mastic from first | No |
---|
Third floor | Brown tile on left | No |
---|
Vinyl Flooring | Brown vinyl sheet flooring, basement. | Yes |
---|
Dandeneau
Location | Description | Asbestos: (Yes/No) |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
BB | Bulk | No |
---|
Hallway | Pipe insulation | Yes |
---|
Mastic | | Yes |
---|
Room 211 | Wall | No |
---|
third floor corridor | Brown, top floor tile | No |
---|
| Red, bottom flooring | No |
---|
| Mastic | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
114 | PCM | Yes |
---|
| Ceiling | No |
---|
| Tile | Yes |
---|
| Mastic | Yes |
---|
| Swept from floor/doorway (bulk) | No |
---|
118 | Bulk | No |
---|
211 | Window glazing | No |
---|
225 | Window glazing | No |
---|
307 | Window glazing | Yes |
---|
414 | Window glazing | No |
---|
Ceilings | Corridor (only) acoustical ceilings. | Yes |
---|
Exterior | Window glazing east side | No |
---|
| Window glazing west side | Yes |
---|
| Window perimeter expansion glazing east side | Yes |
---|
| Window perimeter expansion glazing west side | Yes |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
Tank insulation | Mechanical room. | Yes |
---|
Vinyl Flooring | 9" X 9" brown & 12" X 12" gray. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
201 | Elbow insulation | Yes |
---|
| Pipe joint insulation | Yes |
---|
206 | Mastic | Yes |
---|
| Air sample | No |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
Stairwell, bookstore | Floor tile | No |
---|
| Mastic | Yes |
---|
Tank insulation | Sub Basement. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Duplicating room | Bulk sample – wipe | No |
---|
Drain pipe | Joint insulation | No |
---|
Pipe insulation | Basement floor. | Yes |
---|
Tank insulation | Basement condensate tank. | Yes |
---|
Tunnel to | Tan tile | No |
---|
Cumnock | Mastic off 1 | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Basement | Chiller Mechanical Room | Yes |
---|
| Muffler Mechanical | Yes |
---|
Janitor’s closet – fourth floor | Elbow insulation | No |
---|
| Valve insulation | No |
---|
Mechanical room | Elbow | Yes |
---|
Lydon Innovation Center Basement | 6” Wall base molding | No |
---|
| 4’x8’ Acoustical Board | No |
---|
| Residual brown and gold carpet adhesive | No |
---|
| Skim coat on concrete wall/column | No |
---|
| Gypsum wallboard | No |
---|
| Joint compound associated with gypsum wallboard and plaster wall | No |
---|
| Plaster wall skim and base | No |
---|
| Plaster ceiling skim and base | No |
---|
| Black coating over window w/squares | No |
---|
| Cement floor white crack sealant | Yes |
---|
| Canvas tape duct seam sealant – Boiler room AC-3 | No |
---|
| Duct hanger seam sealant | No |
---|
| Interior window with metal squares glazing | No |
---|
| Interior window glazing corridor | Yes |
---|
| Exterior door caulk | No |
---|
| Exterior metal window frame caulk East entrance | Yes |
---|
| Exterior wall to ceiling caulk symposium center wall | Yes |
---|
| 12x12 slate floor tile grout | No |
---|
| 12x12 slate floor tile bedding mortar corridor | No |
---|
| Interior window caulk | Yes |
---|
| Skim coat on concrete ceiling | No |
---|
| Light weight concrete at duct penetration through wall | No |
---|
Mechanical room | Canvas duct vibration cloth RF3 and AC3 | Yes |
---|
| Abandoned reserve tank flange gasket South East corner | Yes |
---|
| Air hander rib seam sealant AC3 | Yes |
---|
| Small holding tank head cover insulation South East corner | Yes |
---|
| Large holding tank head cover insulation North East side | No |
---|
Pipe insulation | Various types & diameters, basement. | Yes |
---|
2nd Floor Men’s Bathroom | Ceiling plaster | No |
---|
Sides | Left side | Yes |
---|
| Right side | Yes |
---|
| Right side of Chiller | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Between concrete walls | Caulking | No |
---|
Stairwells All Floors | Floor Tile and mastic (Abated) August 2004 | No |
---|
Basement | Mixing station lower elbow | Yes |
---|
Fire Rated Doors | Georgia Pacific Corp. Curtis Door Division (wooden door cores) | Yes |
---|
Mech Rm | Mixing station upper, right elbow | No |
---|
| Mixing station upper, left elbow | No |
---|
| Hot/Cold mixing station | Yes |
---|
| LHS chiller | No |
---|
| RHS chiller | No |
---|
All Hallways | Floor tile and mastic (Abated) | No |
---|
Rooms 203, 212, 218, 219, 222, 223, 305, 311, 312, 403-B, 410, 414, 507, 508, 510, 513, 515 | Floor tile and mastic (Abated) | No |
---|
| Note Old 12x12 tile and black mastic may remain under counter and bench tops | Yes |
---|
Olney 150 | Floor tile and mastic (Abated) June 2006 | No |
---|
Boiler room | Header pipe Glue Dots | No |
---|
| Pipe fitting insulation | No |
---|
All Labs | Glue dots behind chalk boards | Yes |
---|
Olney 313 | Chalkboard removal Glue Dots (Abated) February 2006 | No |
---|
Emergency Generator | Exhaust pipe | Yes |
---|
Mechanical room | Exhaust Generator Pipe Insulator | Yes |
---|
| Heat exchange gasket | Yes |
---|
| Red duct seam sealant | Yes |
---|
Penthouse | Valve CHS 65 | No |
---|
| Bulk | No |
---|
Pipe insulation | Basement mechanical room. | Yes |
---|
| Pipe joints all floors. | Yes |
---|
Roof | Chiller baffle material | Yes |
---|
| Chiller gasket material | Yes |
---|
| Pipe elbow insulation | No |
---|
Ground Floor, Rm. #23 | Elbow insulation | No |
---|
Room 416 | Blackboard mastic | No |
---|
Room 428 | Brown mastic | No |
---|
| Bulk | No |
---|
| Cove base | No |
---|
Room 430 | Blackboard mastic | No |
---|
Room 519 | Bulk | No |
---|
Room 520 | Paneling glue | No |
---|
| Chalkboard mastic | Yes |
---|
| Brown glue on chalkboard | Yes |
---|
| Mastic | Yes |
---|
| White VFT | Yes |
---|
Tank insulation | Basement mechanical room | Yes |
---|
Vinyl Floor Tile | 12" X 12" White tile, All floors. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Tank insulation | Mechanical room. | Yes |
---|
Basement | Elbow insulation from hot water line | No |
---|
Ceiling tile | Bulk asbestos Glue dots | No |
---|
All Rooms | Glue dots behind white boards | Yes |
---|
Floor tile | Bulk asbestos | Yes |
---|
first floor computer room | Floor tile | Yes |
---|
fifth floor | Wall | No |
---|
| Pipe insulation sprayed acoustic | No |
---|
Machine room | Pipe fitting insulation | No |
---|
Room 222 | Floor tile and mastic | Yes |
---|
Room 102, 103, 107, 108, 112, 511, 612 | Floor tile and mastic (Abated) | No |
---|
Room 310 | Insulation | No |
---|
Room 602 | Pipe insulation | Yes |
---|
Room 606 | Floor tile | Yes |
---|
| Ceiling tile | Yes |
---|
Penthouse | Elbow insulation on chill supply pipes | No |
---|
Roof | Chiller baffle material | Yes |
---|
| Chiller gasket material | Yes |
---|
Pipe insulation | Emergency generator exhaust. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
AC-2 | Valve #1, Bulk | Yes |
---|
| Valve #2, Bulk | No |
---|
| Elbow #1 | No |
---|
| Elbow #2 | No |
---|
| Elbow #3 | No |
---|
| Elbow #4 | No |
---|
Basement | 12x12 floor tile | Yes |
---|
| Water tank pipe bulk | Yes |
---|
| Pipe insulation | Yes |
---|
| Pump elbow | No |
---|
| Pipe elbow | No |
---|
| Chiller #2, Elbow #1 | No |
---|
| Chiller #2, Elbow #2 | No |
---|
| Chiller #1, Elbow #1 | No |
---|
| Chiller #1, Elbow #2 | No |
---|
| Elbow on backflow preventer | No |
---|
| Face piece on valve | No |
---|
| Shingle material | Yes |
---|
| Blackboard mastic | Yes |
---|
Mechanical room | Pipe insulation | Yes |
---|
Pipe insulation | Emergency generator exhaust. Pipe joints, All floors. | Yes |
---|
Roof ventilation | Pipe lagging | Yes |
---|
| Elbow lagging | No |
---|
Room 205 | Floor tile and mastic (Abated) | No |
---|
| Elbow pipe insulation in ceiling | Yes |
---|
Room 207 | Floor tile and mastic (Abated) | No |
---|
Room 209 | Floor tile and mastic (Abated) | No |
---|
Room 211 | Floor tile and mastic (Abated) | No |
---|
Room 213 | Floor tile and mastic (Abated) | No |
---|
Room 213 | Elbow pipe insulation in ceiling | Yes |
---|
Room 303 | Bulk samples | No |
---|
third floor mechanical room | Pipe elbow insulation | No |
---|
Tank insulation | Mechanical room 2. | Yes |
---|
Room 101 | Elbow Insulation under sink (exterior wall) abated June 2013 | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Fire proofing | Exterior walls of reactor cylinder. | Yes |
---|
Cooling pipe | Insulation | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Carpenter shop | Elbow from heater | Yes |
---|
Ceiling | Ceiling | No |
---|
Floor Tile First Floor | 12 x 12 floor tile and mastic | No |
---|
First Floor Bathroom | 9x9 Floor tile (mastic is clean) | Yes |
---|
Pipe insulation | Inside Boiler #3 (all other insulation abated July 2012) | Yes |
---|
Tank insulation | Receiver Tank Abated July 2012 | No |
---|
| Boiler #3 Header Gasket | Yes |
---|
Underground steam line and soil | White pipe insulation steam line | Yes |
---|
| Loose debris from pile | Yes |
---|
| Outer insulation from pipe | Yes |
---|
steamTunnelSteam Tunnel (Southwick - Eames)
Location | Description | Asbestos: (Yes/No) |
---|
Pipe insulation | All pipes. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
Email area | 9x9 floor tile | No |
---|
Fax/ ATM area | 9x9 gray floor tile | No |
---|
Game room | 9x9 gray floor tile | Yes |
---|
Kitchen | Black pipe insulation | Yes |
---|
| Wall air duct bulk | Yes |
---|
Room 303 | Brown tile | Yes |
---|
| Black tile | Yes |
---|
| Yellow mastic from black tile | No |
---|
Room 305 | Black mastic from brown tile | No |
---|
| Yellow mastic from brown tile | No |
---|
Room 307 | Tan tile | Yes |
---|
| Black mastic from tan tile | Yes |
---|
| Yellow mastic from tan tile | No |
---|
Student mail room | 9x9 floor tile | No |
---|
Tunnel to Smith | Joint filler | No |
---|
TV area | 9x9 floor tile | No |
---|
UMass Lowell South
allenAllen House
Location | Description | Asbestos: (Yes/No) |
---|
Basement | Boiler room’s aircell pipe insulation | Yes |
---|
| Brown paper pipe insulation | Yes |
---|
Living room | Ceiling plaster | No |
---|
Kitchen | Ceiling plaster | No |
---|
first floor | 9x9 green vinyl tile | Yes |
---|
2nd floor | Vinyl tile | No |
---|
| 9x9 gray tile | Yes |
---|
| Black vinyl tile | No |
---|
Pipe insulation | Various types & diameters, All floors | Yes |
---|
Vinyl Floor Tile | 9" X 9" green tile. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
Brick moldings | Caulking | No |
---|
Boiler room | Ceiling | No |
---|
| Breaching insulation | No |
---|
Ground floor | Window trim | No |
---|
| Exit door paint | No |
---|
| Exit door trim | No |
---|
| Outside door | Yes |
---|
| Outside paneling | No |
---|
first floor | Fire escape door | No |
---|
| Door of fire escape | No |
---|
| Door trim of fire escape | No |
---|
2nd floor | Fire escape door | No |
---|
| Paint of fire escape door #1 | No |
---|
| Trim of fire escape door #1 | No |
---|
| Black trim of fire escape door #2 | No |
---|
Room 112 | Ceiling Plaster | No |
---|
Room 205 | Wall Ceiling | No |
---|
Room 209 | Hallway bulk | No |
---|
Room 306 | Hallway bulk | No |
---|
Window | Black paint on window sill | No |
---|
| Black window pane | No |
---|
| Window pane glazing | No |
---|
| Wood putty | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Vinyl Floor Tile | 9" X 9" tile. | Yes |
---|
first floor | Men’s room ceiling | No |
---|
Pipe insulation | Various sizes in Penthouse. 6th floor elevator lobby. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Vinyl Floor Tile | 9" X 9" tan, gray & blue tile, All floors. | Yes |
---|
Chalkboard | Adhesive | No |
---|
Computer lab | Tile | No |
---|
first floor | Closet, PCM | No |
---|
| Janitor’s closet | Yes |
---|
| Ceiling material | No |
---|
2nd floor | Pipe insulation | Yes |
---|
| Closet, PCM | No |
---|
| Janitor’s closet, bulk | Yes |
---|
| Room #1 tile | Yes |
---|
| Room #2 tile | Yes |
---|
| Room #3 tile | Yes |
---|
| Mastic | No |
---|
| Hallway ceiling material | No |
---|
Storage room | Left pipe sample | Yes |
---|
| Right pipe sample | Yes |
---|
first Floor Registrar’s Office March 2013 | 2’x2’ Ceiling tile main entrance | No |
---|
| Gray duct seam sealant | No |
---|
| Sprinkler pipe thread sealant | No |
---|
| White Block Pipe insulation corridor and Room 101 | Yes |
---|
| Gypsum wall panel Room 101G | No |
---|
| Basecoat wall plaster | No |
---|
| Skim coat wall plaster | No |
---|
| Yellow and black carpet adhesive Room 101, 101A, 101H, and next to stairwell | Yes |
---|
| Black cove base and cove base adhesive | No |
---|
| Joint compound Room 101, 101E, and 101F | No |
---|
| Gypsum wallboard Room 101, 101E | No |
---|
| Drain Line Insulation next to Room 101D | Yes |
---|
| Floor leveler Room 101 | No |
---|
| Sink basin undercoating | No |
---|
| Ceramic tile grout/mortar Room 101D | No |
---|
| 2’x4’ ceiling tile Room 101 | No |
---|
| Red fire stop Room 101 | No |
---|
| Glue behind gypsum wall panel | No |
---|
| Gray Window caulking | Yes |
---|
Pipe Insulation | Various types & diameter, All floors. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
114 | Purple textured floor tile | Yes |
---|
| Red textured floor tile | No |
---|
| Floor tile mastic | Yes |
---|
| Blue textured floor tile | No |
---|
| White floor tile | No |
---|
| Cove base | No |
---|
| Cove base mastic | No |
---|
| Generator Exhaust pipe | No |
---|
Janitor’s closet | Hot water pipe insulation | No |
---|
Room 419 | Abated 120 sq. ft. of purple floor tile and black mastic (6/17/2012) | No |
---|
Mechanical Room | Generator Pipe Insulation | No |
---|
Custodial Room 310 | Elbow Insulation | No |
---|
Roof Membrane | Black Heterogeneous, Fibrous, Roofing Felt | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Ceilings | Acoustical ceilings, All floors unless otherwise noted. | Yes |
---|
Ductwork dust | Sampled November 2001 | No |
---|
Window | Window caulking | Yes |
---|
| Floor tile and mastic all floors unless otherwise noted | Yes |
---|
first Floor Hallway | Floor tile and mastic (Abated) July 2006 | No |
---|
Rooms 200/201 | Floor tile and mastic and acoustical ceiling (Abated) July 2006 | No |
---|
Room 212 A,B,C | Floor tile and mastic and acoustical ceiling (Abated) June 2007 | No |
---|
Gym | Double door insulation | No |
---|
| Partition core | No |
---|
Men’s locker room | Shower ceiling | No |
---|
Steam Pit | Pipe insulation | Yes |
---|
Auditorium | Wall | No |
---|
Rooms B7,B8,101, 103, 108 | Over laid 12x12 non acm tile over 9x9 tile and mastic containing asbestos | Yes |
---|
Office B4 | 80 sq. ft. floor tile and mastic (Abated) | No |
---|
Gym | Double Door Insulation | No |
---|
| Brown patrician core | No |
---|
Women’s locker room | Room | No |
---|
Offices | #1 PCM (Air Sample) 3/28/2005 | No |
---|
| #2 PCM (Air Sample) 3/28/2005 | No |
---|
| #3 PCM (Air Sample) 3/28/2005 | No |
---|
| #4 PCM (Air Sample) 3/28/2005 | No |
---|
| #5 PCM (Air Sample) 3/28/2005 | No |
---|
| #6 PCM (Air Sample) 3/28/2005 | No |
---|
| #7 PCM (Air Sample) 3/28/2005 | No |
---|
| #8 PCM (Air Sample) 3/28/2005 | No |
---|
| #9 PCM (Air Sample) 3/28/2005 | No |
---|
Pipe insulation | Various types & diameters. All floors. | Yes |
---|
North Stairwell Ground Floor | Floor tile and mastic ground floor landing (Abated) March 2009 | No |
---|
Square wall panels | Acoustical tile material and brown glue dobs on wall | Yes |
---|
Room 9 | PCM | No |
---|
| Air sample | No |
---|
Room 110-A | Room | No |
---|
Room 202 | PCM (Air Sample) 6/15/2005 | No |
---|
Room 203 | PCM (Air Sample) 6/21/2005 | No |
---|
Room 209 | Room | No |
---|
Room 211 | PCM (Air Sample) 4/20/2005 | No |
---|
Room 214 | PCM (Air Sample) 8/10/2000 | No |
---|
| Swipe | No |
---|
Tank insulation | Mechanical room. | Yes |
---|
Weight room | Ceiling | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
2nd floor | 16x16 Tan/Red floor tile over 12x12 dark brown floor tiles and mastic (Tile Over) | Yes |
---|
| Tile from the TV area | Yes |
---|
| Mastic from around the Exit door | Yes |
---|
| Mastic from around the TV area | Yes |
---|
first floor | 12x12 dark brown floor tile/mastic All Floors | Yes |
---|
second Floor Cat Walk Area | Tile and mastic at elevator lobby, and entire Catwalk Area (Abated 8/20/2010) | No |
---|
third Floor Cat Walk Area | Tile and mastic at elevator lobby, and entire Catwalk Area (Abated 8/20/2010) | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Room 500 | Roof drain | No |
---|
All Floors | 12x12 Dark brown floor tile and mastic unless otherwise noted | Yes |
---|
Interior Emergency Generator | Tank insulation, exhaust insulation (Abated June 2013) | No |
---|
Basement Hallway and Electric Room | Floor tile and mastic 780 sq. ft. (Abated) June 2012 | No |
---|
Mailroom | Floor tile and mastic 700 sq. ft. (Abated) November 2011 | No |
---|
First Floor and Mezzanine | Floor tile and mastic 14,000 sq. ft. (Abated) June 2011 | No |
---|
| 1000 Linear feet of acm adhesive paper (Abated) June 2011 | No |
---|
| 500 sq. ft. duct seam sealant and 60 linear feet of gray caulking at brick and concrete junctions (Abated) June 2011 | No |
---|
first and fourth Floors Sept and Nov 2010 testing results | Red/gray duct seam sealant various Locations above ceilings | Yes |
---|
| Adhesive associated with foil paper above ceiling, between angle iron cleat and ceiling deck throughout floor | Yes |
---|
| Window frame caulk and glazing | Yes |
---|
| Gray caulk at brick concrete junctions | Yes |
---|
| Black cementitious wall panels, rooms 412, 413, and 414 | Yes |
---|
| Compressed wood fiber/paper (tectum-style) ceiling panels | No |
---|
| Wall base molding and adhesive | No |
---|
| 2’x4’ ceiling tile front entrance | No |
---|
| Mudded pipe fitting insulation on heating lines first and fourth floors | No |
---|
| Pipe thread sealant on heating lines first and fourth floors | No |
---|
| Pre-fabricated gypsum wall panels first and fourth floors | No |
---|
| Carpet adhesive on quarry tile, front entry, Room 110, 114, and open library area, Room 437 | No |
---|
| Bedding mortar and grout associated with quarry tile | No |
---|
| Ceramic wall and floor tile grout, all areas both floors | No |
---|
| Plaster ceiling finish and base coat, restrooms both floors | No |
---|
| Floor leveling compound, Room 114 | No |
---|
| 2’x’2 ceiling tile fourth floor offices | No |
---|
Room 222 | Dark blue carpet with golden brown adhesive | No |
---|
fourth Floor | Floor tile and mastic 7,000 sq. ft. and duct seam sealant 400 linear feet (Abated) June 2011 | No |
---|
| Floor tile and mastic 15,000 sqft, ACM cement board, window glazing and ductwork seam sealant associated with English Department project renovation. (Abated) December 2010 through January 2011 | No |
---|
South Campus Power Plant
Location | Description | Asbestos: (Yes/No) |
---|
Pipe insulation | Various types & diameters, All floors. | Yes |
---|
Boiler #2 | Bulk | No |
---|
| Drum material | No |
---|
Hazard waste room | Elbow #1 | No |
---|
| Elbow #2 | No |
---|
first floor | Condensate tank face bulk | No |
---|
| Condensate tank side bulk | No |
---|
Tank insulation | Boiler room. | Yes |
---|
Valves | #1 | Yes |
---|
| #2 | Yes |
---|
| #3 | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Between window and brick and concrete and brick | Caulking | No |
---|
first floor | Mechanical room pipe insulation | No |
---|
| Joint elbow | No |
---|
| Insulation from valve joint Floor tile | No |
---|
| Floor tile Red | Yes |
---|
| Mastic Black | Yes |
---|
Classrooms 201, 204, and 206 | Floor tile and mastic (Abated 12/27/2007) | No |
---|
Janice Stecchi’s office, first floor | Wipe | No |
---|
Lecture Room #3 | Pipe elbow from sink | No |
---|
Mechanical Room #001 | Valve insulation pipe to condensate tank from the hot water condensate tank | No |
---|
| Elbow insulation, joint to condensate pipe from the elbow pipe | No |
---|
| Valve insulation from hot water | No |
---|
| Elbow #1 | No |
---|
| Elbow #2 | No |
---|
| Elbow #3 | No |
---|
Mechanical Rooms | Hard pack elbow and fittings at various Locations near strainer; AC2, AC3, AC4, AC5, AC6, AC7, AC8, AC10 | No |
---|
Mechanical Rooms | Hard pack mudded fitting on fiberglass pipe run (12” Line) Chill Water Supply North Side | Yes |
---|
Mechanical Rooms | Hard pack mudded fitting on fiberglass pipe run (1” Line) Condensate North side | No |
---|
Mechanical Rooms | Cement coating over fiberglass insulated fitting chill water supply and return North and South Side. Also on Chill Water UT Tank | No |
---|
Room 303 | Bulk from bench top | No |
---|
| Bulk from bench top, Saff hallway | No |
---|
Room 305 | Wall mount glassware holder | Yes |
---|
Room 307 | Bulk from pipe elbow on table | No |
---|
Window | Caulking | Yes |
---|
Vinyl Floor Tile | 12" X 12" tan tile, All floors. | Yes |
---|
UMass Lowell East
Location | Description | Asbestos: (Yes/No) |
---|
Boiler room basement | Ceiling | No |
---|
Ceilings | Sprayed acoustical ceilings, All floors. | Yes |
---|
Duct insulation | Boiler room exhaust pipe. | Yes |
---|
first floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
2nd floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
third floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
fourth floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
Mechanical room, basement | Elbow 1 | No |
---|
| Elbow 2 | No |
---|
| Debris | No |
---|
| Bulk, top | No |
---|
| Bulk, middle | No |
---|
| Bulk, bottom | No |
---|
| Valve insulation | Yes |
---|
| Boiler Refractory Material | No |
---|
| Rope Gasket Boiler Doors | Yes |
---|
| Boiler Rib Rope Gasket | No |
---|
| Pipe Gasket | No |
---|
| Gypsum wallboard and joint comp. | No |
---|
| Note Boiler removed and abated July 2011 | |
---|
Pipe insulation | Generator room exhaust pipe. | Yes |
---|
Room 109 | Textured ceiling abated 180 sq. ft. July 13, 2012 | No |
---|
Vinyl Floor Tile | White 9" X 9" in building, All floors. | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Basement | Pump #3 | No |
---|
| Elbow from pipe | No |
---|
| Hot water pipe elbow | No |
---|
| Pipe #2 elbow | No |
---|
Pipe insulation | The emergency generator exhaust pipe. | Yes |
---|
Telecommunication room | Elbow | No |
---|
Vinyl Floor Tile | 12" X 12" gray vinyl floors 1 through 6 | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Ceilings | Sprayed acoustical ceilings, All floors. | Yes |
---|
first floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
2nd floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
third floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
fourth floor | Lobby air sample | No |
---|
| East wing air sample | No |
---|
| West wing air sample | No |
---|
Room 115 | Textured ceiling 260 sqft abated July 11, 2011 | No |
---|
Pipe insulation | Hot water tank room. | Yes |
---|
102 | PCM | No |
---|
| Air sample | No |
---|
312 | Ceiling material | Yes |
---|
| Air sample | No |
---|
316 | Air sample by PLM | No |
---|
Room 209 | Textured ceiling 150 sqft abated July 13, 2011 | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Common Wall between Sisters and Gagnon Bldg. | Transite Panel | Yes |
---|
Sisters Bldg. third floor nurses area and basement electrical room | Spray on Fireproofing | No |
---|
Sisters Bldg. third Floor Stairwell | Perimeter Waterproofing | No |
---|
Gagnon Building Roof | Brown Insulation | No |
---|
| Built up tar and gravel | No |
---|
| Insulation under tar and gravel | No |
---|
| Tar on concrete deck | No |
---|
| Felt/tar between insulation | No |
---|
UMass Lowell West
Location | Description | Asbestos: (Yes/No) |
---|
Ceilings | All textured ceiling paint. | |
---|
Kitchen | Elbow insulation | No |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Pipe insulation | Various types & diameters, All floors. | |
---|
Porch | Porch paint (Lead 37.3) | Yes |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Fire Proofing | Structural beams. | |
---|
Pipe insulation | Various types & diameters, All floors. | |
---|
Tank insulation | Basement. | |
---|
Boiler breeching | Basement. | |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Tank insulation | Basement. | |
---|
Location | Description | Asbestos: (Yes/No) |
---|
Walls | Textured paint 2nd floor new addition. | |
---|
Pipe insulation | Various types & diameters, All floors. | |
---|